From discovery to compliant disposal, nationwide
Unexpected contamination is one of the fastest ways to halt a programme. When an excavator uncovers hydrocarbon odours, ash filled made ground, old tanks or discoloured soil, work must stop immediately, and from that moment, contaminated material becomes your legal responsibility.
“A smell of hydrocarbon… Discoloured material that clearly should not be there.”
We manage contaminated and hazardous soil from discovery through classification, testing, treatment and compliant disposal, nationwide.
Correct classification is the biggest cost driver, not removal.
“Material that is genuinely hazardous costs a great deal more to dispose of…
We arrange proper sampling and testing:
Hazardous landfill is the simplest route, and usually the most expensive. Depending on contaminant and volume, soil can often be treated to reduce cost or enable reuse:
Hazardous waste requires documentation that stands up years later. We ensure:
Contaminated ground causes disruption mainly when it isn't dealt with quickly.
“The disruption is mostly caused by delay in dealing with it…
Call as soon as contamination is found. We can usually begin sampling immediately, and because we also supply aggregates and run muck away, we can remove contaminated soil, bring in replacement fill and take away ordinary spoil, all through one contact.
Stop work, don't move or mix the material, and call us.
Testing determines this, not appearance or smell.
Depends on the test suite; faster turnaround options exist where critical.
Sometimes, depending on contaminant levels and end use.
The waste producer, usually the contractor or site owner, until the material reaches a permitted facility.
Yes, subject to survey and classification.
Yes, nationwide.
Tell us what you need and we will come back to you directly. Prefer to talk? Call 01977 620441 or email info@tetrongroup.co.uk.